Production Engineering

Production Engineering

Pre- against post-calculation

The deviations per article and operation, with proposed updated times, so the calculations stop lying.

How you work it in Colleag

  1. 1

    Ask the colleague to put pre-calculation against post-calculation for the articles.

  2. 2

    The colleague reads planned and reported times per operation.

  3. 3

    Review the deviations and the causes.

  4. 4

    Update the times in the business system from the proposals.

A worked example

“Are the calculations right for the articles we ran this autumn?”

The deviation per article and operation: planned against reported time, biggest gaps on top and proposed new values. One-off deviating runs are separated from systematic errors.

Screenshot from Colleag showing the question and the colleague's sourced answer

Screenshot from Colleag. The example uses invented figures.

The material

  • The pre-calculations' times
  • Reported times per operation
  • The manufacturing-order history

You approve

Everything the colleague produces is a proposal with sources. Nothing is published, sent or saved to the archive without a human approving it, and every figure traces to its material.