Production Engineering
NPI follow-up
New articles' actual times against planned, with similar articles as a sanity check, so the right data lands in the business system from the start.
How you work it in Colleag
- 1
Ask the colleague to follow up the new articles after the first batch.
- 2
The colleague compares throughput times and calculations against outcomes, and against similar articles.
- 3
Review the deviations and the sanity check.
- 4
Update times and calculation values in the business system.
A worked example
“Are the lead times and calculations right for the new articles from the first batch?”
Per new article: planned against actual throughput time per operation, pre- against post-calculation, and the comparison against similar existing articles that exposes unreasonable values. Proposed updated values come along.

Screenshot from Colleag. The example uses invented figures.
The material
- The manufacturing orders from the first batch
- The calculations on the new articles
- Similar articles' history
You approve
Everything the colleague produces is a proposal with sources. Nothing is published, sent or saved to the archive without a human approving it, and every figure traces to its material.