Type tests during development, routine tests and final inspection in production, split per requirement so nothing falls between.
How you work it in Colleag
- 1
Ask the colleague to split the testing: what is verified where?
- 2
The colleague reads the requirements and the routing and proposes the split.
- 3
Review: the right test in the right place, nothing doubled, nothing forgotten.
- 4
Approve; the control plan is built from the same material.
A worked example
“Which tests belong to design and which to every produced unit?”
A split per requirement: type tests done once during development, routine tests per unit and the final inspection's points, with the source behind every placement. Requirements tested nowhere are flagged.

Screenshot from Colleag. The example uses invented figures.
The material
- The requirements and standards
- The routing from the business system
- Existing control plans
You approve
Everything the colleague produces is a proposal with sources. Nothing is published, sent or saved to the archive without a human approving it, and every figure traces to its material.